Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 47 results ...

Abdelgawad, M A M (2011) Hybrid decision support system for risk criticality assessment and risk analysis, Unpublished PhD Thesis, , University of Alberta (Canada).

Al-Bataineh, M T (2008) Scenario-based planning for tunnelling construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Allouche, E N (2001) A decision-support model for selection of a trenchless construction method, Unpublished PhD Thesis, , University of Alberta (Canada).

Alvanchi, A (2011) Incorporating the effects of complex dynamic interactions in the construction decision making process, Unpublished PhD Thesis, , University of Alberta (Canada).

Awad, A L S (2012) Intelligent contractor default prediction model for surety bonding in the construction industry, Unpublished PhD Thesis, , University of Alberta.

Azimi, R (2011) An integrated real-time control system for structural steel fabrication projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Chehayeb, N N (1996) Simulation-based project control, Unpublished PhD Thesis, , University of Alberta (Canada).

Corona Suarez, G A (2007) Simulation-aided framework for assessing the effect of project quality management on construction performance, Unpublished PhD Thesis, , University of Alberta (Canada).

Dissanayake, G M (2006) An integrated computational intelligence framework for construction performance diagnosis, Unpublished PhD Thesis, , University of Alberta (Canada).

Ekyalimpa, R (2015) A distributed simulation approach for contractor company performance management in the construction industry, Unpublished PhD Thesis, , University of Alberta.

El Ghandour, W (2007) Integrated information-based construction simulation system, Unpublished PhD Thesis, , University of Alberta (Canada).

Elbarkouky, M M G (2010) A fuzzy consensus building framework for early alignment of construction project teams on the extent of their roles and responsibilities, Unpublished PhD Thesis, , University of Alberta (Canada).

ElNimr, A A (2011) Enhancing space modeling and mobile resources planning in construction operations through a simulation driven visualization framework, Unpublished PhD Thesis, , University of Alberta (Canada).

Fan, H (2007) Leveraging operational data for intelligent decision support in construction equipment management, Unpublished PhD Thesis, , University of Alberta (Canada).

Hajjar, D (1999) A unified modeling methodology for simulation-based planning of construction projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Hasan, M S (2013) Decision support system for crane selection and location optimization on construction sites, Unpublished PhD Thesis, , University of Alberta (Canada).

Inyang, N I (2013) A framework for ergonomic assessment of residential construction tasks, Unpublished PhD Thesis, , University of Alberta (Canada).

Langevine, R (2006) A decision support system for the maintenance management of buildings, Unpublished PhD Thesis, , University of Alberta (Canada).

Liu, J (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction, Unpublished PhD Thesis, , University of Alberta.

Lu, M (2000) Productivity studies using advanced ANN models, Unpublished PhD Thesis, , University of Alberta (Canada).

Mah, D E (2011) Framework for rating the sustainability of the residential construction practice, Unpublished PhD Thesis, , University of Alberta (Canada).

Manavazhi, M R (1998) A configuration-based modeling methodology for the automated generation of simulation models in construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Mao, X (2008) The framework of TRIZ-enhanced-value engineering analysis and its knowledge management, Unpublished PhD Thesis, , University of Alberta (Canada).

Moghadam, M (2014) Lean-mod: An approach to modular construction manufacturing production efficiency improvement, Unpublished PhD Thesis, , University of Alberta (Canada).

Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information, Unpublished PhD Thesis, , University of Alberta (Canada).

Mogollon, J D M (2009) Automation of design and drafting for wood frame structures and construction waste minimization, Unpublished PhD Thesis, , University of Alberta (Canada).

Mohamed, Y (2002) A framework for systematic improvement of construction systems, Unpublished PhD Thesis, , University of Alberta.

Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Olearczyk, J (2010) Crane lifting operation planning and lifted object spatial trajectory analysis, Unpublished PhD Thesis, , University of Alberta (Canada).

Pereira, E S S (2017) A framework for assessing the safety performance of industrial projects using safety-related measures, Unpublished PhD Thesis, , University of Alberta.

Saba, F (2012) A semantic-driven framework for facilitating reusability and interoperability of construction simulation modeling, Unpublished PhD Thesis, , University of Alberta (Canada).

Salem, O M (1999) Infrastructure construction and rehabilitation: Risk-based life cycle cost analysis, Unpublished PhD Thesis, , University of Alberta (Canada).

Shaheen, A A-H I (2005) A framework for integrating fuzzy set theory and discrete event simulation in construction engineering, Unpublished PhD Thesis, , University of Alberta (Canada).

Shahin, A A (2007) A framework for cold weather construction simulation, Unpublished PhD Thesis, , University of Alberta (Canada).

Sharma, V (2010) Asset levels of service-based decision support system for municipal infrastructure investment, Unpublished PhD Thesis, , University of Alberta (Canada).

  • Type: Thesis
  • Keywords: complexity; decision support; optimization; asset management; compliance; decision making; deterioration; funding; investment; rehabilitation; quantification; analytical hierarchy process; stakeholder
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305233571
  • Abstract:
    The single biggest challenge facing municipalities today is a shortage of funds and labor for upgrading and expanding aging infrastructure. This continued lack of funding impairs the municipalities’ ability to maintain desired levels of service. Over the last decade, many Canadian municipalities have faced pressures of increasing complexity in infrastructure asset management decision-making which can be partly attributed to cost escalation, increasing service demand and interdependencies between networks. The goal of this research is to develop the framework for Asset Levels of Service (ALOS)-based decision support systems for municipal infrastructure network investment. The proposed framework is based on the fact that ALOS should be one of the main criteria for municipal infrastructure maintenance, repair and rehabilitation (MR&R). Since ALOS is based on qualitative and quantitative parameters, the use of ALOS in municipal infrastructure MR&R decisions will result in improved funding allocation. Secondary parameters used for municipal infrastructure investment decision making in the proposed framework are the physical deterioration of assets, future growth and the impact on the dependent infrastructure network. The proposed framework focuses on funding allocation for the MR&R of municipal networks. The framework is applicable to municipal infrastructure networks, excluding the other assets such as buildings, parks, etc. Application of the proposed framework is demonstrated by its implementation in the case of urban roads. Implementation is carried out in four phases. Phase I involves the quantification of ALOS for urban roads. Quantification of ALOS for urban roads has various challenges such as multiple users and interdependencies of levels of services between various users. An Analytical Hierarchy Process (AHP) has been used to quantify ALOS. Phase II involves the determination of a multiattribute utility function for investment decision. Calculated multiattribute utility of investment decision is used in the multiobjective optimization model in Phase III. In Phase IV, the proposed methodology is incorporated into a computer application called OPTIsys (OPTImum Infrastructure SYStems). OPTIsys will facilitate MR&R decision making based on fully integrated considerations of ALOS, future demand and network interdependencies. Stakeholders benefiting from OPTIsys include the general public, asset-managers, infrastructure departments and municipal councils. OPTIsys will enable infrastructure departments to maintain the operational capability of the network in compliance with the targeted levels of service. Overall, municipalities will be able to reduce the infrastructure deficit while maximizing economic returns.

Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints, Unpublished PhD Thesis, , University of Alberta.

Soleimanifar, M (2016) Integrated project management framework for a pipe spool fabrication shop, Unpublished PhD Thesis, , University of Alberta.

Song, L (2004) Productivity modeling for steel fabrication projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Taghaddos, H (2010) Developing a generic resource allocation framework for construction simulation, Unpublished PhD Thesis, , University of Alberta (Canada).

Van Tol, A A (2005) Agent embedded simulation modeling framework for construction engineering and management applications, Unpublished PhD Thesis, , University of Alberta (Canada).

Wang, P (2006) Production-based large scale construction simulation modeling, Unpublished PhD Thesis, , University of Alberta (Canada).

Xie, H (2011) Improving dynamic project control in tunnel construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Xie, H (2012) Improving dynamic project control in tunnel construction, Unpublished PhD Thesis, , University of Alberta.

Xu, J (2001) CAD-based integrated simulation environment (CAD-ise), Unpublished PhD Thesis, , University of Alberta (Canada).

Younes, B (2013) A framework for invoice management in construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Yu, H (2010) An integrated approach toward lean for production homebuilders, Unpublished PhD Thesis, , University of Alberta (Canada).

Zhang, X (2006) Toward innovative and efficient infrastructure delivery, Unpublished PhD Thesis, , University of Alberta (Canada).